Due to the remote location of this build it was more economical to pre-paint all exterior cladding, exposed beams and ply floor sheeting prior to transport to site. This was possible due to our large workshop at Norwood where the materials were delivered and handled prior to construction.

Some of the advantages of this process were to minimise the on-site labour requirements thus speeding up the construction process, we were also able to prime all the concealed surfaces therefore ensuring greater longevity of the materials. Ensuring these materials were never exposed to the elements was a critical requirement of the client and builder. A final coat was put on once the building was constructed and the underneath shedding built.

Whilst many holiday homes in the area show signs of needing painting within a short period of time this building won’t need a re-paint for at least 10 years.